

Cyr Drilling conducted a 5,000m winter program on Forum Uranium’s Key Lake Road Project, specifically the Costigan Lake JV. The Costigan Lake Project is located 15 km southwest of the Key Lake deposit on what is interpreted to be the same graphitic horizon that hosts the Key Lake deposits.